Failure to Maintain Safe Building Temperatures and Monitor Humidity
Summary
The facility failed to maintain building temperatures within the regulated range and failed to obtain building humidity levels to accurately assess building temperatures. The deficiency affected all 198 residents residing in the facility. Surveyors observed multiple resident rooms, hallways, dining areas, and spa/shower areas on several floors with temperatures above the facility’s stated acceptable range, including readings in the low to upper 80s and some areas reaching the high 80s and 90s. The facility’s temperature log for 6/29/26 through 7/2/26 showed multiple building temperatures above the allowed range and no humidity levels recorded. Facility staff and leadership described ongoing problems with the building’s chiller and air conditioning system. The Maintenance Director stated the chiller that cools the building had malfunctioned, was being reset repeatedly, and would work only for periods of time before needing to be reset again. The HVAC technician stated several aluminum coils were leaking freon and that the leak was not repairable. The Administrator stated the chiller was old and inefficient, had been repaired multiple times over a couple of weeks, and that the facility was waiting for a temporary chiller while a new unit was being ordered. The Maintenance Director also stated that prior to purchasing a thermometer that measured humidity, only temperatures had been taken daily. During interviews, staff and residents described the building as warm or hot at various times, with some staff reporting that the temperature had been hot for days or weeks and that fans, portable air conditioners, ice water, popsicles, and fluid encouragement were being used. Some residents stated they felt okay and were receiving water, while others said it had been hot the day before but felt better later. On 7/2/26, the facility experienced a power loss affecting the chiller and other systems, and temperatures were again documented above range in resident areas. The report also notes that the facility later initiated evacuation of residents from the upper floors and then the first floor after continued temperature and power issues.
Penalty
Resources
Below are regulatory guidelines relevant to this citation:
Trusted data from CMS and state health departments
Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release October 8, 2026) and official state health department websites — never guesswork.
In your survey window? See what surveyors are citing.
The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.