F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
E

Improper Bed Rail Installation and Maintenance

Carlyle Senior Care Of BlackvilleBlackville, South Carolina Survey Completed on 03-31-2026

Summary

The facility failed to ensure correct installation, use, and maintenance of bed rails for 3 of 3 residents reviewed for bed rail use: R4, R56, and R72. The facility policy titled Proper Use of Bed Rails stated that bed rails would be used with a person-centered approach and that the facility would ensure correct installation, use, and maintenance before use, including checking manufacturer compatibility, inspecting for possible entrapment areas, and regularly checking that rails remained correctly installed and had not shifted or loosened. The policy also stated the facility would follow manufacturer recommendations regarding disabling or tying rails down. R4 was admitted with quadriplegia and an unspecified cervical spinal cord injury, had a BIMS score of 15, and had a care plan calling for 1/2 side rails to promote bed mobility and full and/or half side rails up per physician order for safety during care provision and to assist with bed mobility. R4's informed consent for bed rails documented risks associated with rail use and noted verbal consent because he was unable to sign. R56 was admitted with quadriplegia, had a BIMS score of 0, was total care for ADLs, and had a care plan intervention for bilateral padded 1/2 side rails for positioning and bed mobility. R56's informed consent for bed rails also documented the risks and recorded verbal consent by the POA. R72 was admitted with schizophrenia, Guillain-Barre syndrome, and a disorder of the brain, had a BIMS score of 15, and had informed consent for bed rails signed by the responsible party. During interview, R4 stated that when EMS came to transfer him to the gurney, the bed rail would not come down because a zip tie was holding it in the up position, and EMS had to cut the zip tie to lower the rail. During observation and interview, the Maintenance Assistant confirmed that bilateral bedrails were secured by zip ties on R72's bed, R56's bed, and R4's bed. The Administrator and Maintenance Assistant confirmed the facility altered the beds by using zip ties to hold the bed rails up and down without using the bed manufacturer's spare parts and recommendations. The Maintenance Director stated that the zip ties had been placed incorrectly, that the side rails were supposed to be able to move up and down, that none of the bed rails could be moved up or down safely, and that the bed was in disrepair when the rails could not be brought up or down safely.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Resources

Below are regulatory guidelines relevant to this citation:

See other F0700 citations
Inaccurate Bedrail Care Plans and Missing Ongoing Assessments
E
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

Inaccurate bedrail care plans and missing ongoing assessments were identified for three residents. Two residents had bilateral enabler bars observed on their beds, but their last enabler-restraint assessments were outdated, and one resident had bilateral enabler bars with no order or ongoing assessment in the record. The residents had diagnoses including HTN, Parkinson's disease, depression, hyperlipidemia, and hemiplegia, and the facility policy required risk evaluation for bed rail use.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Inaccurate Bed Rail Assessments
D
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

Inaccurate Bed Rail Assessments: The facility failed to complete ongoing accurate assessments for a resident’s right enabler side rail use. The resident had diagnoses including DM, hyperlipidemia, and depression, and the record showed quarterly bed rail evaluations stating bed rails were not recommended, yet a right enabler bar was observed on the bed and an RN confirmed the evaluations were not accurate.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Bed Rail Evaluations Not Completed Before Use
E
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

Bed Rail Evaluations Not Completed Before Use The facility failed to complete bed rail evaluations for three residents who had bilateral 1/3 bed rails in use. One resident had severe cognitive impairment after a cerebral infarction and an incomplete bed rail evaluation remained in progress; another resident with hemiplegia, hemiparesis, and no decision-making capacity had bed rails ordered but no evaluation or care plan; and a third resident with a history of falls and bone density disorder had bed rails installed on readmission without a nursing evaluation. Staff confirmed the evaluations were not completed to assess appropriateness and entrapment risk.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Assess Entrapment Risk and Obtain Informed Consent for Bed Enabler Bars
D
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

Failure to assess entrapment risk and obtain informed consent for bed enabler bars. Two residents had bilateral enabler bars on their beds and were observed using them for positioning and bed mobility. One resident had dx including difficulty walking and muscle weakness; the other had repeated falls and generalized weakness. Surveyors requested documentation, but the facility could not provide entrapment zone measurements, and for one resident there was no informed consent documentation.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Obtain Informed Consent for Bed Rails
E
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

Failure to obtain informed consent for bed rails was identified for four residents. One resident had CVA-related deficits, blindness, muscle weakness, and an absent lower leg; another had Alzheimer’s disease, osteoporosis with fractures, reduced mobility, and muscle weakness; a third had adult failure to thrive and depression; and a fourth had adult failure to thrive, depression, and disorientation. Records included restraint or siderail assessments documenting quarter rails or upper side rails, but the EHRs lacked evidence of informed consent, and each resident was observed with upper side rails in place.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Improper Bed Rail Assessment and Use
E
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

Improper Bed Rail Assessment and Use: The facility used grab bars as bed rails for multiple residents without completing the required pre-installation assessment process. Residents with diagnoses including muscle weakness, dementia, hemiplegia/hemiparesis, altered mental status, and fall history were observed with bilateral grab bars in place even when the BSA was incomplete, not recommended, or assessed for the wrong rail type. The QAN and DON stated grab bars are bed rails and that the required process was not followed.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Citation search

Search every citation & Plan of Correction

Go to search
Citation watch

Track new serious citations across South Carolina

Get a heads-up on the newest immediate-jeopardy (J–L) citations in South Carolina — where surveyors are focused right now.

Free · about one email a month

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release October 8, 2026) and official state health department websites — never guesswork.

In your survey window? See what surveyors are citing.

The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.

Get the Survey-Prep Report
An unhandled error has occurred. Reload 🗙

Connection lost — reconnecting… We couldn't reconnect automatically. Please reload the page to continue.