Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$29 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0291
F

Failure to Document Required Annual 90‑Minute Emergency Lighting Test

Boca Raton, Florida Survey Completed on 04-30-2026

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

Surveyors identified a deficiency related to emergency lighting when, during record review and staff interview between 11:30 AM and 3:00 PM with the Director of Facilities, the facility was unable to provide documentation that the required annual 90‑minute testing of emergency lighting had been performed. The Director of Facilities acknowledged that there was no documentation available to show completion of this annual 90‑minute emergency lighting test, as required by NFPA 101 (2012 and 2021 editions), sections 19.2.9.1 and 7.9. This failure to document the annual emergency lighting test was cited as a noncompliance that could affect all occupants of the facility in the event of a fire or other emergency. No specific residents, medical histories, or clinical conditions were mentioned in the report; the deficiency pertains to facility-wide life safety systems and their required testing and documentation.

Plan Of Correction

Emergency Lighting CFR(s): NFPA 101 Preparation and/or execution of this plan does not constitute admission or agreement by the provider that a deficiency exists. This response is also not to be construed as an admission of fault by the facility, its employees, agents or other individuals who draft or may be discussed in this response and plan of correction. This plan of correction is submitted as the facility's credible allegation of compliance and Soley because it is required Emergency Lighting K0291 The facility immediately conducted a comprehensive inspection of all emergency lighting systems. On The Director of Facilities performed the required 90-minute annual testing of all emergency lighting units. Documentation of testing has been completed and is maintained on-site. 2. All areas of the facility were considered at risk due to lack of documented annual testing. A full facility-wide audit of all emergency lighting units was completed on by the Director of Facilities to ensure compliance. 3. The facility implemented a preventative maintenance schedule to ensure annual 90-minute emergency lighting testing is completed in accordance with NFPA 101 (2012), Section 7.9. A log tracking system has been developed to document all required testing. The Director of Facilities/designee will receive re-education on Life Safety Code requirements and documentation standards. 4. The Director of Facilities will review fire alarm testing records quarterly for 12 months, will present the findings for 12 months at Quality Assurance Performance Improvement (QAPI) meetings to confirm inspections have taken place. During and at the conclusion of the twelve months, the QAPI committee will re-evaluate and initiate necessary action or extend the review period. The Administrator is responsible for confirming implementation and ongoing compliance with the components of the Plan of Correction, and resolving variances that may occur. The Administrator is responsible for confirming the status of this Plan of Correction is reviewed and discussed at QAPI meetings and action initiated if required. Emergency Lighting CFR(s): NFPA 101 Preparation and/or execution of this plan does not constitute admission or agreement by the provider that a deficiency exists. This response is also not to be construed as an admission of fault by the facility, its employees, agents or other individuals who draft or may be discussed in this response and plan of correction. This plan of correction is submitted as the facility's credible allegation of compliance and Soley because it is required Emergency Lighting K0291 The facility immediately conducted a comprehensive inspection of all emergency lighting systems. On The Director of Facilities performed the required 90-minute annual testing of all emergency lighting units. Documentation of testing has been completed and is maintained on-site. 2. All areas of the facility were considered at risk due to lack of documented annual testing. A full facility-wide audit of all emergency lighting units was completed on by the Director of Facilities to ensure compliance. 3. The facility implemented a preventative maintenance schedule to ensure annual 90-minute emergency lighting testing is completed in accordance with NFPA 101 (2012), Section 7.9. A log tracking system has been developed to document all required testing. The Director of Facilities/designee will receive re-education on Life Safety Code requirements and documentation standards. 4. The Director of Facilities will review fire alarm testing records quarterly for 12 months, will present the findings for 12 months at Quality Assurance Performance Improvement (QAPI) meetings to confirm inspections have taken place. During and at the conclusion of the twelve months, the QAPI committee will re-evaluate and initiate necessary action or extend the review period. The Administrator is responsible for confirming implementation and ongoing compliance with the components of the Plan of Correction, and resolving variances that may occur. The Administrator is responsible for confirming the status of this Plan of Correction is reviewed and discussed at QAPI meetings and action initiated if required.

Long-term care team reviewing survey readiness and plan of correction

We Help Long-Term Care Teams Stay Survey-Ready

We process and analyze inspection reports and plan of correction using AI to extract insights and trends so providers can improve care quality and stay ahead of compliance risks.

Discover our solutions:

An unhandled error has occurred. Reload 🗙