Failure to Document and Follow Up on Urology-Ordered Catheter-Related Procedures
Penalty
Summary
The deficiency involves the facility’s failure to provide timely follow-up management and care for a resident with an indwelling catheter after a urology consultation. The resident was admitted with obstructive and reflux uropathy, congenital malformation of the urinary system, and severe intellectual disabilities, and was dependent on staff for toileting with an indwelling catheter in place. A urology visit summary documented that the resident was to be scheduled for cystoscopy, laser lithotripsy of a bladder stone, and a transurethral resection of the prostate. Nursing notes indicated that the resident returned from the urology appointment with a recommendation for a future operating room schedule. However, there was no documented evidence in the electronic medical record that the facility followed up with the urologist or contacted the resident’s medical doctor regarding scheduling these procedures. Subsequently, the resident was admitted to the hospital with an obstructed Foley catheter, bilateral hydronephrosis, and acute kidney injury, and prior nursing documentation noted cloudy yellow urine, poor intake, and lethargy with an order to send the resident out for further evaluation. Interviews revealed that central supply staff, who were responsible for scheduling appointments, stated they called the urology office weekly but did not have access to the EMR and kept paper logs of attempts that were not retained. The infection preventionist, LNHA, and ADON acknowledged that there was no facility policy for scheduling out-of-facility appointments, that the process relied on central supply’s undocumented personal log, and that no consult follow-up form was completed because the urology office was expected to schedule the surgery. The facility’s charting documentation policy stated that the medical record should facilitate communication between the interdisciplinary team, but there was no documentation of follow-up attempts or escalation when the procedures were not scheduled.
