Improper G-Tube Medication Administration
Summary
The facility failed to provide appropriate treatment and services to prevent complications of enteral feeding for one resident with a g-tube. Resident #8 was a male resident with dysphagia, severe cognitive impairment, and a feeding tube noted on the MDS assessment. His care plan reflected that he required a PEG tube and that one goal was for him not to experience adverse effects. The physician order for g-tube medication administration required flushing with 30 cc of water before medications, flushing between each medication with 5 to 30 ml of water, and flushing with 30 cc after medication administration. During an observation of medication administration via g-tube, LVN D prepared two medications for the resident and administered them through the tube. She crushed one medication and opened a capsule for the other, then placed the medications on a tray with water. She connected a 60 ml syringe to the g-tube, checked placement and residual, and then administered the first medication without flushing the tube beforehand. She flushed each medication with 15 ml of water, then flushed the tube four additional times with 30 ml each, totaling 120 ml of water. She stated she was supposed to flush the tube before medication administration to make sure it was not clogged and acknowledged she had forgotten to do so. The ADON and DON stated that flushing the g-tube before medication administration and using the ordered amount of water were important to prevent clogging and to ensure medications went through properly. They also stated that using more or less than the ordered amount of water could affect the resident, and that too much water could cause fluid overload, vomiting, and aspiration. The facility policy for tube medication administration also required flushing the tube with water prior to medication administration.
Penalty
Resources
Below are regulatory guidelines relevant to this citation:
Trusted data from CMS and state health departments
Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release October 8, 2026) and official state health department websites — never guesswork.
In your survey window? See what surveyors are citing.
The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.