Broken Toilets, Shower Plumbing Failures, and Room Leak
Summary
The facility failed to provide a clean, functional, homelike environment in multiple resident areas, including shower rooms and resident rooms. Two residents, one with a BIMS score of 14 and one with a BIMS score of 12, shared a toilet in their room that was broken and covered with a black plastic bag. When the bag was lifted, the toilet smelled of human waste and contained a brown liquid substance appearing to be human waste. One resident stated the toilet had been broken for 3 weeks and that he had to roll his wheelchair to the shower room to use a toilet, where he sometimes had to wait if the shower room was in use. The other resident stated the shared toilet made it harder to use a restroom because he had to go to a shower room to use a toilet. CNA staff reported the toilet had been broken for 1.5 weeks to a month, and the Maintenance Director stated he had placed the toilets out of order because they had not yet been replaced. The facility also had shower room plumbing problems affecting residents who required assistance with bathing. In the 100 Hall shower room, a resident with a BIMS of 14 and dependent on staff for showers stated the shower was always cold and had not worked well since she had lived at the facility. Another resident with a BIMS of 14 and requiring supervision for showers stated the 100 Hall shower was cold and that it took turning the water on 30 minutes in advance to get a warm shower. The Maintenance Director checked the hot water temperature in the 100 Hall shower room and recorded 76.5 degrees Fahrenheit. In the 200 Hall shower room, residents and staff reported broken faucets that would spin without working, requiring staff to use valves in the back of the shower to adjust water temperature and pressure. Residents stated this made the shower room inconvenient and frustrating, and staff reported the water could become too hot and could burn residents. The Maintenance Director observed the faucet spinning, confirmed he could not adjust the temperature with the faucets, and stated he would replace them. The facility also had a plumbing leak in two resident rooms. During observation, water was pooled underneath a sink, on the floor near a window, and inside a closet, with a fan placed on the floor and plugged in near the sink with the cord in the water. The Maintenance Director stated he had noticed the leak two days earlier, was not sure where it was coming from, and had not fixed it because he was waiting for the area to dry and to determine the source. He stated residents were to be moved when rooms flood, but he had not moved the residents in that room. The facility’s TELS work order summary did not reflect work orders for the hot water issue in the 100 Hall shower room or the broken faucets in the 200 Hall shower room. The facility policy stated maintenance service shall be provided to all areas of the building, grounds, and equipment, and that plumbing fixtures are to be maintained in good working order.
Penalty
Resources
Below are regulatory guidelines relevant to this citation:
Trusted data from CMS and state health departments
Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release August 26, 2026) and official state health department websites — never guesswork.
In your survey window? See what surveyors are citing.
The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.