Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0511
E

Inadequate Clearance Around Breaker Panels

Clarkston, Michigan Survey Completed on 05-13-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

During an observation conducted on May 13, 2025, at approximately 9:45 AM, it was found that the facility did not maintain the required minimum clearance of 36 inches around the breaker panels located in the maintenance office. Combustible materials were observed placed in front of these breaker panels. This situation was confirmed by both the Facility Maintenance Director and the Administrator during interviews at the time of observation. The deficiency pertains to the facility's failure to ensure that equipment using gas or gas-related piping complies with NFPA 54 and that electrical wiring and equipment comply with NFPA 70, as required by regulatory standards. The report notes that this practice could affect 16 out of 87 occupants in the event of a fire emergency.

Plan Of Correction

The facility removed the combustible and there is no longer obstructions at the front of the breaker panels. The Maintenance Director/Designee has been educated to ensure that the maintenance office will maintain a minimum of 36 inches of clearance around the breaker panel. The Maintenance Director/Designee will conduct routine rounds to ensure that the maintenance office is maintaining a minimum of 36 inches of clearance around the breaker panel and they are not obstructed. Negative findings will be corrected and forwarded to the Executive Director, and trends will be forwarded to the QAPI Committee for additional review. The Executive Director is responsible for attaining and maintaining compliance with the regulation.

An unhandled error has occurred. Reload 🗙