F0924 F924: Put firmly secured handrails on each side of hallways.
E

Loose and Unsecured Handrails in Shower Rooms

South Pointe Rehabilitation And Care CenterOklahoma City, Oklahoma Survey Completed on 03-03-2025

Summary

The facility failed to ensure that handrails in two of seven shower rooms (Hall 100 and Hall 200) were firmly secured to the wall. Observations revealed that multiple handrails under the shower heads and on the back wall in these rooms were loose, wiggled easily, or were hanging off the wall, with metal coverings and screws exposed. Certified Nursing Assistants (CNAs) reported being aware of the loose handrails, with one stating it was frightening to use and another noting that the affected side of the shower was avoided for approximately two months due to the issue. CNAs indicated that they reported the problems to nursing staff, who were responsible for entering maintenance requests into the electronic notification system. Despite these reports, the maintenance supervisor stated there were no current repairs in progress and was unaware of the loose handrails until shown by surveyors. The maintenance supervisor acknowledged the danger posed by the loose handrails. The administrator confirmed that the facility did not have a specific policy on handrails and relied on state and federal regulations. At the time of the survey, 182 residents resided in the facility, and seven shower rooms were present.

Penalty

Inspection fine: $72,1437 days payment denial
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Resources

Below are regulatory guidelines relevant to this citation:

See other F0924 citations
Loose Handrail in First Floor Corridor
D
F0924 F924: Put firmly secured handrails on each side of hallways.
Short Summary

Loose Handrail in First Floor Corridor: A handrail on the front side of the nursing station was observed to be loose to touch during an inspection of the 1st floor nursing unit. A housekeeper confirmed it was not secured properly and said he had known about it since Thursday but was unsure whether maintenance had been notified. An RN supervisor confirmed that handrails should be securely affixed to the walls.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Unsecured hallway handrail in North Station
D
F0924 F924: Put firmly secured handrails on each side of hallways.
Short Summary

Unsecured hallway handrail in North Station: The facility failed to keep a hallway handrail firmly secured to the corridor wall. An observation found the handrail was not secured, and the DON, MS, and IPN all stated it was not sturdy and should be secured for resident use. The MS reported that three of the mounts attaching the rail to the wall were broken.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Corridor Missing Handrails Near Exposed Electrical Equipment
F
F0924 F924: Put firmly secured handrails on each side of hallways.
Short Summary

Corridor Missing Handrails Near Exposed Electrical Equipment: The facility failed to ensure corridor handrails were present on both sides. An egress corridor leading to the outdoor picnic and smoking areas contained newly installed generator-related electrical equipment, including transfer switches, manual disconnect switches, and electrical panels, without guards on the corridor side. Residents were observed using the corridor, and the missing handrails were noted on the same side as the equipment.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Loose Handrail in Hall C
D
F0924 F924: Put firmly secured handrails on each side of hallways.
Short Summary

Loose Handrail in Hall C: A hallway handrail between Rooms C3 and C4 was observed to be loose and wobbly rather than firmly secured to the wall. The Maintenance Supervisor stated he was not aware of the issue unless it was written in the maintenance logbook, and the work order log showed no related work orders. The facility policy states maintenance must keep the building safe and operable at all times.

Inspection fine: $13,0705 days payment denial
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Loose Stairway Handrail Not Secured to Wall
D
F0924 F924: Put firmly secured handrails on each side of hallways.
Short Summary

The facility did not maintain a safe environment when the upper end of a stairway handrail on the right side going up from the parking lot to the first floor was found loose and easily movable during an observation with maintenance staff. The Maintenance Supervisor and Maintenance Assistant confirmed the handrail was not properly secured to the wall. Review of the facility’s “Quality of Life - Homelike Environment” P&P showed a requirement to provide a safe, clean, comfortable, and homelike environment, which was not followed in this situation.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Broken Hallway Handrail
D
F0924 F924: Put firmly secured handrails on each side of hallways.
Short Summary

Broken Hallway Handrail: A handrail on the 200 hall outside a room was observed broken and displaced about 3 inches vertically when pressure was applied. The Administrator and Maintenance Director confirmed handrails should be secure to the wall and agreed the handrail needed repair. The facility policy stated maintenance is responsible for keeping buildings and equipment safe and operable.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Citation search

Search every citation & Plan of Correction

Go to search
Citation watch

Track new serious citations across Oklahoma

Get a heads-up on the newest immediate-jeopardy (J–L) citations in Oklahoma — where surveyors are focused right now.

Free · about one email a month

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release July 29, 2026) and official state health department websites — never guesswork.

In your survey window? See what surveyors are citing.

The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.

Get the Survey-Prep Report
An unhandled error has occurred. Reload 🗙