Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
D

Electrical Safety Deficiencies in Facility

Huntington, New York Survey Completed on 02-07-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that live parts of electrical equipment were adequately guarded against accidental contact, as required by NFPA 70: National Electrical Code. During a Life Safety Code recertification survey, surveyors observed several deficiencies related to electrical installations. On the second floor, electrical cables were found hanging by the wall near a ramp in a resident-occupied area. In the basement's former rehabilitation room, live electrical cables were stored in a plastic bucket and left out in the open, and additional cables were seen hanging from the ceiling. These observations indicate a failure to maintain electrical installations in a neat and workmanlike manner, as well as a failure to guard live parts against accidental contact, posing potential safety hazards to residents and staff.

Plan Of Correction

Plan of Correction: Approved March 6, 2025 Pine(NAME) Center for Rehabilitation and Healthcare provides this Plan Of Correction. 1. No Residents were affected by this deficient practice. 2. All residents have the potential to be affected by this deficient practice. 3. The electrical cables by the ramp have been covered and the facility will have the vendor onsite to discuss removing the cables. 4. The cables in the former Rehabilitation room have all been removed or covered up. 5. The EVS Director/designee will conduct an audit around the facility to identify any additional wiring that needs to be covered up. 6. The EVS Director will audit the facility every week for the first 4 weeks and then monthly for 3 months and then quarterly for up to a year to ensure all live electrical cables are covered. 7. The EVS Director/designee will present any findings in the quarterly QA/QAPI meetings. 8. The EVS Director/designee will be responsible to correct this deficiency.

An unhandled error has occurred. Reload 🗙