Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0161
D

Unprotected Steel Beams Found in Facility

Holmes, New York Survey Completed on 03-31-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

During a life safety survey, it was observed that the facility did not maintain all structural components to meet the requirements for a Type II (222) building construction. Specifically, unprotected steel beams were found on the first floor landing of the East stair and in the garage attached to the building, which is accessible from the first floor. These findings indicate a failure to comply with the construction type limitations as outlined in the 2012 NFPA 101 standards, which require complete automatic sprinkler protection for buildings of this type.

Plan Of Correction

Plan of Correction: Approved April 17, 2025 K 161- Automatic Sprinkler Protection I. IMMEDIATE CORRECTIVE ACTION: A licensed Contractor was hired to encapsulate the exposed, unprotected steel beams with the approved 2-hour NFPA material. II. IDENTIFICATION OF OTHERS AFFECTED: All residents have the potential to be affected. In order to ensure full compliance of this standard throughout the facility, all beams were assessed. None were found deficient at this time. III. SYSTEMIC CHANGES: A Monthly Compliance Audit of affected/corrected beams will begin (MONTH) 2025. These monthly audits will continue for a period of 3 months with results reported by the Director of Maintenance to the facility QAPI Committee. Any negative findings will be immediately reported to the Director of Maintenance and corrected. IV. QAPI MONITORING: The findings of the above noted compliance audit will be reported to the facility Quality Assurance and Performance Improvement Committee monthly for 3 months by the Director of Maintenance. Any trends or concerns that may be identified will be discussed by the committee and any interventions will be implemented. The QAPI Committee will determine the need for ongoing reporting. Completion Date: 05/30/2025 Responsible Party: Director of Maintenance