Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
F

Generator Testing Documentation Deficiency

Rye, New York Survey Completed on 02-20-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that all required tests for the generator were conducted in accordance with NFPA 101, NFPA 110, and NFPA 99 standards. Specifically, during a life safety recertification survey, it was observed that the monthly generator logs for the years 2024 and 2025 were missing documentation of the time power was transferred to the generator during the monthly test for the transfer switch. This omission was noted for the months of May, (MONTH), and (MONTH) in 2024, and (MONTH) in 2025. The Director of Facilities acknowledged in an interview that the generator was serviced by a vendor during those months and committed to ensuring that the time of power transfer would be documented in the future.

Plan Of Correction

Plan of Correction: Approved April 10, 2025 Identification of other residents having the potential to be affected was accomplished by: All residents have the potential to be affected. Action taken/systemic change put into place to reduce the risk of future occurrence include: Director of Facilities or designee will develop and implement a standardized log for generator load tests that includes transfer switch timeframes by 4/1/25. How the corrective action will be monitored to ensure the deficient practice will not reoccur: Beginning on 4/1/25 the Director of Facilities or designee will audit the Generator Log monthly through (MONTH) 31, 2025 and report findings to QAPI. Date of Completion and Person Responsible: 4/20/25, Director of Facilities

An unhandled error has occurred. Reload 🗙