Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0929
D

Unsecured Oxygen Cylinder in Transport Cart

Saint Petersburg, Florida Survey Completed on 03-31-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to manage an oxygen cylinder in accordance with NFPA 99 standards. During a facility tour conducted by the Maintenance Director and the Regional Maintenance Consultant, it was observed that an e-size oxygen cylinder in a transport cart was unsecured. The cylinder was not properly secured to the cart, which is a violation of the safety standards outlined in NFPA 99. The observations were confirmed through an interview with the Maintenance Director and the Regional Maintenance Consultant, who acknowledged the findings. These findings were subsequently reviewed with the Administrator, the Maintenance Director, and the Regional Maintenance Consultant during the exit conference. Photographic evidence was obtained to document the unsecured oxygen cylinder, further substantiating the deficiency.

Plan Of Correction

1. The e-size oxygen cylinder in transport cart was secured on 03/31/2025 by the Maintenance Director. 2. The Maintenance Director conducted quality assurance check on e-size oxygen cylinders in transport carts to ensure they were secured on 4/1/2025 and no additional findings notes. 3. Education was provided to facility staff on securing e-size oxygen cylinder in transport securely by the NHA or designee by 4/25/2025. The Maintenance Director, or designee, will conduct weekly for 12 weeks audit on 5 random e-size oxygen cylinders in transport carts to ensure they are secured. 4. All results of the quality assurance checks will be monitored and reviewed by the QA&A committee monthly until substantial compliance is assured.

An unhandled error has occurred. Reload 🗙