F0655 F655: Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted
D

Failure to Develop Comprehensive Baseline Care Plans

Concordia At Rebecca ResidenceAllison Park, Pennsylvania Survey Completed on 03-13-2025

Summary

The facility failed to ensure that a baseline care plan, which includes the minimum healthcare information necessary to properly care for a resident, was fully developed and implemented for two residents. Resident R154, who was admitted with a diagnosis of a left tri malleolar fracture, osteoarthritis, and high blood pressure, had a physician order for Rivaroxaban, an anticoagulant, which was not included in the baseline care plan. This omission indicates a lack of comprehensive planning to address the resident's anticoagulant care needs upon admission. Similarly, Resident R155, admitted with Parkinson's Disease, obstructive sleep apnea, and sepsis, had physician orders for a right upper extremity PICC line and a JP drain, which were not included in the baseline care plan. Additionally, the resident had a left shoulder surgical site with a JP drain and gauze dressing, which also lacked proper care planning. The Director of Nursing confirmed the facility's failure to develop and implement a complete baseline care plan for these residents, highlighting a deficiency in meeting the regulatory requirements for resident care policies and nursing services.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Resources

Below are regulatory guidelines relevant to this citation:

See other F0655 citations
Baseline Care Plan Missing PICC Line and Contact Isolation Needs
D
F0655 F655: Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted
Short Summary

A resident admitted after hospitalization for a MDR UTI was receiving IV meropenem through a PICC line and required contact isolation precautions and an indwelling catheter. Although the admission report and nurse-to-nurse handoff documented these needs, the baseline care plan did not include the PICC line or isolation precautions among the resident’s immediate care needs. Staff interviews confirmed the resident arrived with these treatments and precautions in place, and the DON stated the expectation was for a baseline care plan to be developed and implemented within 24 hours of admission.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Complete Baseline Care Plan Within Required Timeframe
D
F0655 F655: Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted
Short Summary

A resident admitted with schizoaffective disorder, HIV, bipolar disorder, and insomnia did not have a baseline care plan developed within the required 48 hours. The Unit Manager confirmed she was responsible for completing and tracking baseline care plans, and verified the resident’s plan was not completed on time.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Baseline Care Plan Not Completed for Bed Mobility and Transfers
D
F0655 F655: Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted
Short Summary

A resident admitted with traumatic subdural hemorrhage, T5-6 vertebral fractures, and respiratory failure did not have a baseline care plan with instructions for positioning, bed mobility, or transfers within 48 hours of admission. The EHR and bedside Kardex lacked guidance for nursing staff, and observations showed the resident slouching in bed and later with feet touching the lower bed frame. An LPN and the DON both stated the care plan did not meet expectations.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Provide Baseline Care Plan Summary
D
F0655 F655: Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted
Short Summary

A resident admitted with asthma, hypothyroidism, and HTN did not have evidence in the record that a written summary of the baseline care plan and order summary was provided to the resident and/or representative. The NHA confirmed the missing documentation during interview.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Include EBP for PEG Tube in Care Plan
D
F0655 F655: Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted
Short Summary

A resident with hemiplegia, severe cognitive impairment, a feeding tube, and surgical wounds was ordered EBP for a PEG tube, but the care plan did not include the EBP need or related interventions. The DON confirmed the omission and stated that the care plan is meant to communicate interventions for resident safety, protection, and care.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Develop Baseline Care Plans Within 48 Hours
D
F0655 F655: Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted
Short Summary

Failure to Develop Baseline Care Plans Within 48 Hours: The facility did not open baseline care plans within the required timeframe for three residents reviewed for abuse and falls. One resident’s abuse care plan was started well after admission and the baseline plan did not include abuse. Another resident’s abuse/neglect plan was started after an abuse allegation, and a third resident with a high fall risk score had no baseline fall care plan despite a fall and an abuse allegation after admission. The Care Plan Coordinator confirmed the baseline plans were not in place as required.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Citation search

Search every citation & Plan of Correction

Go to search
Citation watch

Track new serious citations across Pennsylvania

Get a heads-up on the newest immediate-jeopardy (J–L) citations in Pennsylvania — where surveyors are focused right now.

Free · about one email a month

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release July 29, 2026) and official state health department websites — never guesswork.

In your survey window? See what surveyors are citing.

The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.

Get the Survey-Prep Report
An unhandled error has occurred. Reload 🗙