Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
E

Unsealed Openings in Elevator Shaft

Pittsford, New York Survey Completed on 02-19-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

During a Life Safety Code Survey conducted from February 11 to February 19, 2025, a deficiency was identified on the first floor of a long-term care facility. The facility failed to properly maintain vertical openings, specifically within a fire-rated enclosure of an elevator shaft. Observations made on February 11, 2025, at 10:48 AM revealed unsealed openings in the elevator shaft located in the first-floor elevator equipment room. These included two approximately 1/2-inch by three-inch openings around electrical raceways and two approximately 1/2-inch by three-inch semi-circular openings around hydraulic lines. These openings extended through the concrete block wall into the elevator shaft. The facility has two elevators serving the first, second, and third floors. During an interview, a Maintenance Staff Member mentioned that some upgrades to the elevators had been completed a couple of months prior to the survey.

Plan Of Correction

Plan of Correction: Approved March 5, 2025 1. Facility conducted an immediate inspection on all vertical openings in the elevator shaft on 02/12/2025. All unsealed openings were sealed immediately by facilities staff using fire rated materials on 02/12/2025. 2. Maintenance performed a facility wide audit of all openings to identify any additional unsealed openings. All openings were sealed by facilities staff. 3. Education will be provided to all pertinent staff regarding the importance of sealing any needed openings/penetrations in fire walls. 4. A monthly audit of fire wall penetrations will be conducted monthly for three months. A copy of the audits will be presented to QAPI committee who will then decide the needed frequency of the audits thereafter. Responsible Party: Director of Facilities