Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0374
E

Failure to Maintain Smoke Barrier Doors

Harrisburg, Pennsylvania Survey Completed on 03-13-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the cross-corridor smoke barrier doors, which affected two of the eight smoke compartments within the component. During an observation on March 13, 2025, at 12:00 PM, it was noted that the left leaf of the cross-corridor smoke barrier doors on the 2nd floor, near Resident Room H18, did not close properly due to a faulty door closure. This deficiency was confirmed during an interview at the exit conference with the Administrator and Maintenance Director on the same day at 1:45 PM.

Plan Of Correction

The closer on the left leaf of the cross corridor smoke barrier doors near Resident Room H18 will be repaired or replaced to allow the door to close. All cross corridor doors have been inspected to see if they close. The Maintenance Director has been re-educated on the importance of checking that smoke barrier doors close fully. The Maintenance Director or designee will inspect cross corridor smoke doors for proper closing and smoke resistance each month. The NHA or designee will audit the cross-corridor doors for self-closing and smoke resistance quarterly.

An unhandled error has occurred. Reload 🗙