Egress Clearance Deficiencies
Summary
The facility failed to maintain the minimum required clearances along the means of egress, affecting both levels of the building. During an observation, it was noted that the Northeast Stair Tower had a width of 33 inches, which is below the required width of 36 inches. Additionally, the Basement Level was found to have inadequate headroom clearance along the exit access corridor, with a height of approximately six feet, six inches, which is less than the required six feet, eight inches. These deficiencies were confirmed during an exit interview with the Administrator, Director of Maintenance, and Assistant.
Penalty
Trusted data from CMS and state health departments
Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release July 29, 2026) and official state health department websites — never guesswork.
In your survey window? See what surveyors are citing.
The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.