Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0222
E

Failure to Maintain Delayed Egress Doors

Philadelphia, Pennsylvania Survey Completed on 01-23-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the delayed egress doors on one of its three levels, specifically on the first floor. During an observation on January 23, 2025, at 10:52 a.m., it was noted that the delayed egress door by the Laundry did not alarm and open as required. This deficiency was confirmed during an exit interview with the Administrator and Maintenance Director later that morning. Additionally, another observation on the same day at 11:29 a.m. revealed that the delayed egress door near resident room 701 lacked the necessary signage. The sign should have instructed individuals to 'PUSH UNTIL ALARM SOUNDS DOOR CAN BE OPENED IN 15 SECONDS.' This absence of signage was also confirmed during the exit interview with the facility's administration and maintenance staff.

Plan Of Correction

1. The delayed egress door by laundry has been repaired to alarm and properly function. The proper signage was placed on the delayed egress door next to resident room 701. 2. NHA/Designee will educate the Maintenance Director on the requirements for maintaining delayed egress doors and ensuring they have the proper signage that reads "PUSH UNTIL ALARM SOUNDS DOOR CAN BE OPENED IN 15 SECONDS." 3. NHA/ Designee will audit the delayed egress doors in the facility to ensure proper function and signage. 4. NHA/Designee will conduct a random audit of delayed egress doors to ensure they are properly functioning and have the proper signage posted, weekly x4 monthly x3. 5. Results of the audit to be reported to monthly QA.

An unhandled error has occurred. Reload 🗙