Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0161
C

Building Construction Type Violation

Laporte, Pennsylvania Survey Completed on 01-29-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility was found to be in violation of building construction requirements as it was observed to be three stories in height, which exceeds the maximum allowable story height for its documented construction type, Type II (000). According to the National Fire Protection Association (NFPA) 101 Life Safety Code, a Type II (000) building is not permitted to have any stories if it is non-sprinklered. This deficiency was identified during an observation on January 29, 2025, at 9:50 am. The facility administrator confirmed during an exit conference on the same day that the facility indeed exceeded the maximum allowable story height by one floor.

Plan Of Correction

FSES was completed on 8/26/2024. Facility will maintain an up to date FSES.

An unhandled error has occurred. Reload 🗙