Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0511
E

Non-compliance with NFPA 70 Due to Inadequate Clearance

Yeadon, Pennsylvania Survey Completed on 01-21-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to comply with NFPA 70, National Electric Code, regarding electrical wiring and equipment. During an observation on January 21, 2025, it was noted that there was storage within three feet of electrical panels in two locations on the first floor. Specifically, the storage was found in the storage room across from Occupational Therapy and in the Laundry Dryer Room. According to NFPA 70 110.26(A)(1), a clearance of three feet is required in front of electrical equipment with a nominal voltage to ground of 0 to 150 volts. This deficiency was confirmed during an exit interview with the Administrator and the Maintenance Director.

Plan Of Correction

The storage within three feet of the electrical panels across from the Occupational Therapy room and the laundry dryer room have been removed. The facility has determined that all electrical panels in the building have the potential to be affected. The Maintenance Director has in-serviced the staff to ensure that storage remains three feet from the electrical panels throughout the building. The Maintenance Director will randomly audit electrical panels throughout the building weekly. This plan of correction will be monitored at the monthly Quality Assurance Performance Improvement meeting until such time consistent substantial compliance has been met.

An unhandled error has occurred. Reload 🗙