Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0374
E

Smoke Barrier Door Deficiency on First Floor

Dunmore, Pennsylvania Survey Completed on 12-23-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the smoke barrier separation doors on the first floor, specifically those located closest to the Nurse's Station. During an observation conducted on December 23, 2024, at 10:50 a.m., it was noted that these doors required adjustment to fully latch. This deficiency was confirmed during an exit interview with the Facility Administrator and the Facilities Manager later that day, between 1:25 p.m. and 1:30 p.m.

Plan Of Correction

First floor, smoke barrier separation doors, were adjusted and fully latch. Smoke barrier separation doors throughout the facility were audited and fully latch. NHA/Designee educated the Maintenance Director on NFPA 101 Subdivision of Building Spaces-Smoke Barrier. Maintenance Director will randomly audit Smoke barrier separation doors 1x week for 4 weeks then monthly x2.

An unhandled error has occurred. Reload 🗙