Failure to Complete Quarterly MDS Assessments Timely
Summary
The facility failed to complete the Quarterly Minimum Data Set (MDS) assessments in a timely manner for 46 out of 49 residents reviewed. The MDS is a resident assessment tool used to facilitate the management of care, and the Quarterly Assessment is considered timely if the Assessment Reference Date (ARD) is within 92 days after the ARD of the previous MDS, with completion no later than 14 days after the ARD. The report details that the facility did not meet these requirements, with assessments being overdue by a range of 32 to 117 days for various residents. The MDS Coordinator (MDSC), who has been in the role for three years, acknowledged that the MDS assessments were behind schedule. The MDSC was responsible for completing assessments in two buildings, which contributed to the delay. The facility's policy on MDS 3.0 Completion, implemented on October 15, 2024, specifies that Quarterly Assessments should be completed using an ARD no greater than 92 days from the most recent prior quarterly or comprehensive assessment. The deficiency was identified through interviews, record reviews, and a review of facility documentation and the CMS Long-Term Care Facility Resident Assessment Instrument (RAI) 3.0 User's Manual. The MDSC admitted to the survey team that she was aware of the backlog and the need to assist the other building, which impacted the timely completion of the assessments.
Penalty
Resources
Below are regulatory guidelines relevant to this citation:
Trusted data from CMS and state health departments
Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release October 8, 2026) and official state health department websites — never guesswork.
In your survey window? See what surveyors are citing.
The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.