F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
E

Deficiencies in Bed Rail Assessment and Documentation

Beloved Health And Rehabilitation CenterHannibal, Missouri Survey Completed on 11-27-2024

Summary

The facility failed to properly assess and document the use of bed rails for two residents, leading to deficiencies in safety and compliance. For Resident #20, the facility did not conduct a comprehensive assessment of the risk of entrapment before installing bed rails. The resident's medical records lacked documentation of any recent assessments or entrapment zone measurements, and there was no evidence that the risks and benefits of the bed rails were discussed with the resident. The resident, who had moderately impaired cognition and was at high risk for falls, was observed with assist rails in the upright position, but the facility did not have a policy for entrapment risks and bed rail use. Resident #19's situation also highlighted significant deficiencies. The resident's informed consent form for bed rail use was incomplete, with both consent boxes left blank and no staff signature or date. The resident's care plan and medical records were inconsistent, showing discrepancies between the type of rails assessed and those observed. The resident, who had severe cognitive impairment and required substantial assistance, was observed with padded half rails, although the assessment indicated quarter rails. The facility did not document any evaluation of bed rail use or entrapment risk assessments, and the resident's DPOA was not informed of the risks and benefits of bed rails. Interviews with the DON and LPN revealed that the facility lacked proper procedures and documentation for bed rail assessments and consents. The DON admitted that side rail assessments should be completed quarterly, and consents should be obtained from the resident or their representative. However, the facility did not have a policy for entrapment risks, and staff were not aware of who conducted the assessments or when they were re-evaluated. This lack of documentation and assessment led to the improper use of bed rails, posing potential safety risks to the residents.

Penalty

Inspection fine: $175,20158 days payment denial
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Resources

Below are regulatory guidelines relevant to this citation:

See other F0700 citations
Failure to Assess and Obtain Consent Before Bed Rail Use
D
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

Failure to assess and obtain consent before bed rail use for two residents. Two cognitively intact residents with diagnoses including AFib, HTN, arthritis, CAD, and HF were observed with bed rails on their beds even though their MDSs indicated no bedrail use. Both records lacked a bedrail assessment, consent, and education, and the DON confirmed no assessment had been completed before the rails were installed.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Assess Bed Rail Entrapment Risk and Mattress Settings
J
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

A resident with severe cognitive impairment and total dependence for care fell from bed after an air mattress was set too high for the resident’s weight, causing the mattress to overinflate and push the resident into a siderail. The resident’s arm became trapped in the rail and the resident sustained neck and sternum injuries. The record also showed no siderail entrapment assessment for the resident, and multiple other residents with air mattresses and siderails also lacked documented side rail assessments.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Reassess Bed Siderail Safety Led to Resident Injury
G
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

A facility failed to complete ongoing reassessments of bed siderail safety for a resident with severe cognitive impairment and total dependence for bed mobility. The resident continued using the siderails for months without the required review, and later developed bruising and a traumatic posterior shoulder dislocation after the arm was reportedly caught in the rail. An internal investigation and later assessment found the siderails were unsafe and no longer indicated.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Assess and Obtain Consent for Bed Rail Use
D
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

Failure to Assess and Obtain Consent for Bed Rail Use: Two residents had one-quarter bed rails in place with physician orders for positioning and mobility, but the clinical record lacked documented bed rail safety assessments and signed informed consent. One resident had moderately impaired cognition and the other had severely impaired cognition; both were observed with the rails up and locked in place. The ADM and DON acknowledged the assessments and consents were missed, and staff stated the required documentation should have been completed before bed rail use.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Document Alternatives and Monitor Bed Rail Use
D
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

A resident with acute and chronic respiratory failure with hypoxia, Type 2 DM with hyperglycemia, generalized muscle weakness, and impaired cognition was placed in four locked bed rails for fall risk. The record showed only one alternative intervention, one-to-one activities and supervision, with no documented evidence explaining why it was ineffective, and the DON stated there was no documented active order for a low bed or other alternative. The resident was observed asleep with all four bed rails up and locked, and the care plan and active orders did not show monitoring for safe bed rail use.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Assess Bed Rail Entrapment Risk
J
F0700 F700: Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.
Short Summary

Failure to Assess Bed Rail Entrapment Risk: A resident with severe cognitive impairment and multiple medical conditions was placed in a bed with assist rails without documented assessment for appropriateness, documented alternatives, or informed consent. Staff later found the resident with his head and neck trapped between the mattress and the assist bar, unresponsive and not breathing, and CPR was started before EMS transported him to the hospital. The resident was admitted with cardiac arrest and diffuse hypoxic injury and later expired.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Citation search

Search every citation & Plan of Correction

Go to search
Citation watch

Track new serious citations across Missouri

Get a heads-up on the newest immediate-jeopardy (J–L) citations in Missouri — where surveyors are focused right now.

Free · about one email a month

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release August 26, 2026) and official state health department websites — never guesswork.

In your survey window? See what surveyors are citing.

The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.

Get the Survey-Prep Report
An unhandled error has occurred. Reload 🗙

Connection lost — reconnecting… We couldn't reconnect automatically. Please reload the page to continue.