F0924 F924: Put firmly secured handrails on each side of hallways.
E

Corridor Handrails Not Secure

Willow Grove Post AcuteHatboro, Pennsylvania Survey Completed on 09-09-2024

Summary

The facility failed to equip corridors with safe handrails on each side, as observed in two nursing units, specifically the First and Second floor nursing units. Observations revealed that the handrails in the corridors were either loose, missing, or broken. Specific locations with deficiencies included the corridor next to room [ROOM NUMBER] with a missing end piece, and rooms 219, 216, 213, 224, 221, 223, 228, 227, 116, 122, 123, 124, as well as the first shower room, all of which had loose or broken handrails. This deficiency was confirmed through an interview with the Nursing Home Administrator, who acknowledged the issue of broken or missing handrails.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Resources

Below are regulatory guidelines relevant to this citation:

See other F0924 citations in Ohio
Lack of Secured Handrails in 200 Unit Hallway
E
F0924 F924: Put firmly secured handrails on each side of hallways.
Short Summary

The facility failed to provide secured handrails in the hallway of the 200 unit, potentially affecting 15 independently mobile residents. During a tour, it was observed that no handrails were affixed to the walls. The Administrator confirmed this absence, stating that the unit was being remodeled and handrails needed to be ordered. This issue was investigated under multiple complaint numbers.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Handrails in Disrepair
F
F0924 F924: Put firmly secured handrails on each side of hallways.
Short Summary

The facility failed to ensure handrails were in good repair, potentially affecting all residents. During an observation, a missing portion of the handrail was noted across from the 300-hall dining/activity area and next to the area where puzzles were kept. The Maintenance Assistant verified the observation and stated he did not know how long it had been that way but would get it fixed.

Fine: $159,66083 days payment denial
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

65.1% of Ohio facilities received at least one citation during their inspection in the last 12 months.Will yours be survey-ready?

Surveyors issued 55 serious citations across Ohio in the last 12 months. See exactly what they're citing.

Get ready for your next survey

See what surveyors are citing in Ohio and spot your risk areas before they do.

Monthly Citation Reports

Have you been cited for this tag?

Save hours drafting a compliant Plan of Correction — AI built on real approved POCs.

Plan of Correction Writer

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release May 27, 2026) and official state health department websites — never guesswork.

Trusted by long-term care providers and associations.

Allegria Senior Living logo
FHCA logo
WeCare Centers logo
Care Rehab logo
An unhandled error has occurred. Reload 🗙