Failure to Complete Physician-Ordered Laboratory Tests
Summary
The facility failed to ensure that physician-ordered laboratory tests were completed for a resident who had undergone a renal transplant. The resident was informed by the provider that blood work was to be done, but it had not been completed. The resident was supposed to have weekly Creatinine levels checked and avoid nephrotoxic agents, including diuretics, as per the provider's notes. Additionally, the provider planned for Vitamin B12/Folate levels to be checked with the next blood draw, but these orders were not reflected in the laboratory orders. The review of the resident's laboratory results and physician orders showed that several tests, including a Basic Metabolic Panel (BMP) with glomerular filtration rate (GFR), Complete Blood Count (CBC) with differential, Complete Metabolic Panel (CMP), and Magnesium (Mag), were not completed as ordered. The Treatment Administration Record (TAR) indicated that some orders were discontinued while pending confirmation, and the Medication Administration Record (MAR) did not include any laboratory tests. Interviews with staff revealed a lack of awareness and understanding of the process for confirming and entering laboratory orders, contributing to the oversight. The Interim Director of Nursing (DON) and other staff members acknowledged the issue with the laboratory orders not being entered correctly into the system. The facility's policy on laboratory services and reporting emphasized the need for timely provision of laboratory services and prompt notification of results outside the clinical reference range. However, the deficiency in ensuring the completion of physician-ordered laboratory tests for the resident was evident, as the orders were not properly entered or confirmed, leading to missed tests.
Penalty
Resources
Below are regulatory guidelines relevant to this citation:
Trusted data from CMS and state health departments
Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release July 29, 2026) and official state health department websites — never guesswork.
In your survey window? See what surveyors are citing.
The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.