Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
N0132

Failure to Ensure Trained Staff for Manual Power Transfer During Outages

Saint Petersburg, Florida Survey Completed on 07-22-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to provide a detailed emergency power plan in accordance with the Florida Administrative Code (FAC) requirements. During a record review conducted between 9:15 AM and 10:15 AM with the Director of Maintenance (DOM), it was found that the facility could not provide evidence that an on-site and trained individual was available during all shifts to manually transfer power from the public utility to the generator using the generator's manual transfer switch in the event of a power outage. In an interview conducted concurrently with the record review, the DOM stated that he had only been responsible for the facility for a few months and was not aware that staff were not trained for the task of manually transferring power. This lack of awareness and training among staff directly contributed to the facility's inability to meet the regulatory requirement for emergency environmental control. The deficiency was cited under FAC 59A-4.1265(6)(a), which mandates that nursing homes develop and implement written policies and procedures to ensure effective and immediate activation, operation, and maintenance of the alternate power source. The facility's failure to ensure that staff were trained and available to perform the manual transfer of power during all shifts led to noncompliance with this regulation.

Plan Of Correction

Education was completed with facility staff regarding the manual transfer of power during a power outage through the generator manual transfer switch. New employees will be educated on this process as part of the orientation process. Education will be completed with the NHA/designee by the regional plant consultant on manual transfer of generator task education requirement. An audit will be completed by the NHA/designee and will include all new employee files on transfer of power education completion. The audit will be conducted weekly for 4 weeks, then weekly for 2 weeks, and monthly for 2 weeks. Results of the audit will be reported to the QAA&C Committee for comments and recommendations monthly for three months.