Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Failure to Maintain Emergency Generator Annunciator Panel

Pottstown, Pennsylvania Survey Completed on 08-06-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the emergency generator system as required by NFPA standards. During an observation on July 30, 2025, at 11:50 a.m., it was found that the annunciator panel, located at the first floor Nurses Station, was not supplied with electricity and did not function when tested. This panel is a critical component for monitoring the status of the emergency generator system. The deficiency was confirmed during an exit interview with the Administrator and Maintenance Director on the same day. The lack of a functioning annunciator panel affected the entire facility, as it compromised the ability to monitor and respond to emergency power needs as outlined in regulatory requirements.

Plan Of Correction

Vendor out on 8/13/25 to replace annunciator panel. Maintenance director was reeducated by NHA/Designee on K0918 with focus on proper maintenance of emergency generator. Maintenance director/designee will monitor the monthly generator log for four months to ensure compliance. Results of the audits to be reviewed at the QAA committee to determine the need for further follow-up/monitoring.

An unhandled error has occurred. Reload 🗙