Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0920
E

Improper Use of Extension Cord as Permanent Wiring in Mechanical Room

Battle Creek, Michigan Survey Completed on 05-08-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

A deficiency was identified when, during an observation in the South Mechanical Room, a green extension cord was found being used as permanent wiring. The extension cord was plugged into a wall outlet, and its other end, which was missing the female connector, had wires spliced and directly wired into a call light box. This setup was confirmed by the Facility Maintenance Director at the time of observation. The use of the extension cord in this manner does not comply with NFPA 99 and NFPA 70 requirements, which prohibit the use of extension cords as a substitute for fixed wiring and require that extension cords be removed immediately after temporary use.

Plan Of Correction

K920 1. The Maintenance Director and/or designee will replace the extension cord in the South Mechanical Room with an NFPA approved device. 2. The Administrator will review regulation K920 and provide education to the Maintenance team on the requirements. 3. The Maintenance Director and/or designee will conduct a full community audit weekly to ensure any extension cord utilized is compliant with NFPA guidelines. Results of the audits will be brought to the Quality Assurance Performance Improvement meetings for review. The Committee will be responsible for any changes to the auditing process. 4. The Administrator is responsible to attain and maintain compliance. Completion date for compliance will be 06.20.25.

An unhandled error has occurred. Reload 🗙