E0006 E006: Conduct risk assessment and an All-Hazards approach.
F

Failure to Maintain Updated All-Hazards Risk Assessment

Schuylkill CenterPottsville, Pennsylvania Survey Completed on 06-24-2025

Summary

Schuylkill Center was found to be noncompliant with federal emergency preparedness requirements following an Emergency Preparedness Survey. The facility failed to provide an updated all-hazards risk assessment, which is required to be reviewed and updated at least annually. During document review, surveyors were unable to obtain documentation of a current all-hazards risk assessment for the facility. At the time of the exit conference, both the Administrator and Maintenance Director confirmed that they could not provide an updated all-hazards risk assessment. This deficiency affected the entire facility component and was based solely on the lack of required documentation. No specific residents or patient medical histories were mentioned in relation to this deficiency.

Plan Of Correction

The facility will continue to provide an updated all hazards risk assessment for the facility. 1. The facility utilizes the Kaiser Permanente Hazard Vulnerability Assessment Tool, which was last updated at the time of annual manual approvals on 1/17/2025. This tool will be updated at least quarterly, or as needed, and used to identify and update the facility's Emergency Preparedness plan. The Hazards Risk Assessment will be filed in all copies of the Emergency Preparedness plan. 2. The Maintenance Director or designee will audit the Hazard Vulnerability Assessment tool at least semi-annually to confirm that updates are filed in all copies of the Emergency Preparedness plan. Results of the audits will be reviewed at least semi-annually with the QAPI Committee, including any revisions required to the Facility Emergency Preparedness plan as a result of the assessment. Date of Correction is 7/30/2025.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
See other E0006 citations
Failure to Maintain Current All-Hazards Emergency Preparedness Risk Assessments
F
E0006 E006: Conduct risk assessment and an All-Hazards approach.
Short Summary

Surveyors found that the facility’s Emergency Preparedness Plan was not compliant with regulatory requirements because it lacked a documented community-based all-hazards risk assessment and the facility-based hazard vulnerability analysis had not been updated on an annual basis. During document review and an interview with the Maintenance Director, it was confirmed that the community-based HVA was missing from the plan and that the existing facility-based assessment had last been updated in 2024, leaving the plan without current, comprehensive all-hazards risk assessments.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Maintain Emergency Preparedness Plan with Required Risk Assessment
C
E0006 E006: Conduct risk assessment and an All-Hazards approach.
Short Summary

Surveyors found that the facility did not have a written Emergency Preparedness Plan that included an annually updated facility-based and community-based risk assessment using an all-hazards approach. This deficiency was confirmed through document review and interviews with facility leadership.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Maintain Updated All-Hazards Risk Assessment
F
E0006 E006: Conduct risk assessment and an All-Hazards approach.
Short Summary

Kadima Rehabilitation & Nursing at Lititz failed to provide an updated all-hazards risk assessment as required for emergency preparedness. During a survey, document review and interviews with the DON and Director of Maintenance confirmed that the facility did not have current documentation of this assessment, affecting the entire facility.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Deficient Emergency Preparedness Plan and Risk Assessment
F
E0006 E006: Conduct risk assessment and an All-Hazards approach.
Short Summary

The facility did not maintain an updated, site-specific emergency preparedness plan, and its hazard vulnerability assessment lacked scoring based on the likelihood of emergency events. This deficiency was confirmed through documentation review and interviews with facility leadership.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Deficient Emergency Preparedness Plan and Risk Assessment Documentation
F
E0006 E006: Conduct risk assessment and an All-Hazards approach.
Short Summary

The facility did not maintain an Emergency Preparedness plan that was reviewed and updated annually, and failed to provide documentation of a written, geographically specific risk assessment for hazards identified in the emergency plan. Required documentation supporting compliance with an all-hazards approach, including missing residents, was not available for review, as confirmed by the Maintenance Director and Corporate Operations Director.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Document All-Hazards Risk Assessment
C
E0006 E006: Conduct risk assessment and an All-Hazards approach.
Short Summary

The facility did not meet emergency preparedness guidelines due to the absence of a documented risk assessment utilizing an all-hazards approach. This deficiency was confirmed during a document review and an interview with the maintenance director, highlighting non-compliance with the requirement to maintain an updated emergency preparedness plan.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Citation search

Search every citation & Plan of Correction

Go to search
Citation watch

Track new serious citations across Pennsylvania

Get a heads-up on the newest immediate-jeopardy (J–L) citations in Pennsylvania — where surveyors are focused right now.

Free · about one email a month

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release July 29, 2026) and official state health department websites — never guesswork.

In your survey window? See what surveyors are citing.

The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.

Get the Survey-Prep Report
An unhandled error has occurred. Reload 🗙