Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0211
F

Obstructed Exit Access Corridors During Construction

Kalamazoo, Michigan Survey Completed on 04-30-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

During an observation conducted between 12:00 PM and 1:00 PM, construction equipment, materials, and resident room furniture were found stored in the 100 corridor and in spaces open to that corridor, obstructing the exit access corridors. The construction room door was blocked open, and there was no separation between the construction work area and the corridor. Additionally, glue vapors were present in the corridor, indicating improper ventilation. At the time of the survey, a floor renovation was ongoing in residents' rooms, with some rooms still occupied by residents not under renovation. Construction materials were also stored in a resident day area open to the corridor.

Plan Of Correction

1. All exit access corridors were cleared of all obstructions, including construction equipment/materials and resident furniture, in accordance with LSC 19.2.2 and chapter 7. 2. Actively scheduled staff requiring education will be identified to receive education on keeping exit corridors clear of obstructions. 3. The Director of Plant Operations and/or designee will conduct a weekly audit, and results of the audits will be brought to the Quality Assurance Performance Improvement Committee monthly for review. Any changes to the auditing process will be made by the QA Committee. The Administrator is responsible for attaining and maintaining compliance. 4. The completion date for compliance will be 05/1/2025