Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0711
E

Missing Evacuation Map in Corridor

Armada, Michigan Survey Completed on 06-11-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to provide the required evacuation map in the Maple Ridge corridor, as observed during a survey. The evacuation map is necessary to identify locations within the facility and to highlight designated evacuation routes to the exterior of the building. This deficiency was confirmed through observation and interview with the Maintenance Director. The lack of an evacuation map could affect 26 of 64 residents in the event of a fire or other emergency requiring area evacuation. Employees were not periodically instructed in their duties under the evacuation plan as required by regulatory standards, and the written plan for the protection and evacuation of all residents was not fully implemented in this area.

Plan Of Correction

ELEMENT 1 On 6/27/25 an evacuation map was placed on Autum Ridge to identify the current location within the facility and highlight designated evacuation routes to the exterior of the facility. ELEMENT 2 Rounds were conducted by the Maintenance Director and/or designee on all fire corridors to ensure there are evacuation maps present. ELEMENT 3 The Maintenance Director has been reeducated on maintaining evacuation maps throughout the building in all fire corridors. ELEMENT 4 The Maintenance Director/designee will conduct weekly audits for 1 month to ensure all fire corridors have the required evacuation maps. ELEMENT 5 Date of compliance 06/27/2025. The Maintenance Director and/or designee will be responsible for sustained compliance.

An unhandled error has occurred. Reload 🗙