Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0291
F

Failure to Document Required Emergency Lighting Tests

Farwell, Michigan Survey Completed on 03-06-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to provide documentation that all battery-powered emergency lighting was tested annually for 90 minutes and function tested monthly for 30 seconds, as required by NFPA 101, 7.9.3.1.1. During a record review, no activity reports or documentation of these tests were available for surveyor review. These findings were confirmed through an interview with the Director of Facilities at the time of the record review. No information regarding specific patients, their medical history, or their condition at the time of the deficiency was provided in the report.

Plan Of Correction

K291 Emergency Lighting Element 1: Action taken to identify residents: No residents were identified. Element 2: Identification of other residents: All occupants could be affected in the event of an electrical power failure. Element 3: (1) Measures Taken: The Administrator or designee will conduct and document the needed annual 90-minute testing of the facility's battery-operated emergency lighting. Element 3: (2) Measures Taken: The Administrator or designee will conduct and document the needed monthly 30-second testing of the facility's battery-operated emergency lighting. Element 4: Monitoring: The Administrator or designee will compile a report of the battery-operated emergency lighting test for review and recommendations by the Quality Assurance Performance Improvement Committee monthly, three times, and periodically thereafter. The Administrator will assume responsibility for attained compliance.