Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0372
E

Smoke Barrier Wall Penetrations Compromise Fire Resistance

Fremont, Michigan Survey Completed on 05-01-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

Surveyors observed that the facility failed to ensure smoke barriers were constructed to a minimum 1/2-hour fire resistance rating as required by code. Specifically, on April 29, 2025, wire bundle penetrations were found within the smoke barrier walls above the ceiling at the cross corridor doors in both the A wing and B wing. These penetrations were located within the electrical conduit and were confirmed by maintenance staff at the time of observation. The deficiency was identified as potentially affecting 17 occupants within the adjacent smoke compartment if smoke were to pass through these penetrations during a fire. No information regarding the medical history or condition of specific residents was provided in the report.

Plan Of Correction

On April 29th, 2025, the smoke compartments/smoke barriers on unit A and B were immediately repaired by the maintenance department. Maintenance personnel performed a thorough compliance check of all smoke barrier panels throughout the facility. The Maintenance Director has added monthly barrier penetration checks to the Maintenance Care work-order program. Reminders will be auto-generated by the program and documented through Maintenance Care upon completion. The Maintenance Personnel conducted a thorough compliance check of all smoke barrier penetrations throughout the facility to ensure safety and adherence to fire codes. Following this evaluation, the Maintenance Director has implemented a new procedure that incorporates monthly smoke barrier penetration checks into the Maintenance Care work-order program. This proactive approach involves regularly monitoring and assessing the integrity of smoke barriers, which are crucial for maintaining fire safety. As part of this initiative, reminders for these checks will be automatically generated by the Maintenance Care program. Each check completion will be documented within the system to maintain a comprehensive record of compliance and any necessary maintenance actions taken. Maintenance Personnel will conduct a weekly audit for 4 weeks, then monthly or until the home has reached substantial compliance. Results will be taken to QAPI. The Maintenance Director or designee is responsible for sustained compliance. Date of Compliance: June 16th, 2025