Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0291
F

Failure to Provide Emergency Lighting at Generator Transfer Switches

Muskegon, Michigan Survey Completed on 03-26-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to provide automatic emergency lighting in accordance with regulatory requirements, specifically at the emergency generator transfer switches located in the electrical room. During an observation on March 26, 2025, it was noted that there was no battery pack powered emergency light installed at these transfer switches. This deficiency was confirmed through an interview with the facility Maintenance Director at the time of the observation. No information regarding specific residents, their medical history, or their condition at the time of the deficiency was provided in the report.

Plan Of Correction

K291 1. No residents were harmed as a result of this deficient practice. 2. An emergency battery pack powered light has been installed in the electrical room. 3. The QAPI Committee has directed the Director of Plant Operations/designee to perform random audits of facility emergency lighting x 4 weeks to ensure operations. The Administrator is responsible for ensuring that substantial compliance is attained through the Plan of Correction and is maintained thereafter. The results will be provided to the QAPI Committee for further follow-up and review.