Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0916
F

Emergency Generator Alarm Annunciator Not Readily Observed by Staff

Flint, Michigan Survey Completed on 04-24-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that the emergency backup generator annunciation panel was located in a place that is readily observed by operating personnel, as required by NFPA 99 standards. During an observation, it was found that the annunciation panel was installed in the maintenance office, which is not a location that allows for easy monitoring by staff responsible for facility operations. This setup could result in generator alarms not being noticed promptly. The maintenance director confirmed these findings during the surveyor's interview at the time of observation. No information about specific residents, their medical history, or their condition at the time of the deficiency was provided in the report.

Plan Of Correction

1. Annunciator panel was moved to an area readily observed by staff. 2. Audit completed of emergency notification systems to ensure location is easily accessible by staff. Corrections made as needed. 3. Administrator/Designee completed education to Maintenance Department on requirement that remote annunciation must be located outside of any locked rooms and easily accessible for staff to be notified of generator alarms. 4. Maintenance Director/Designee will complete random audits of emergency equipment and alarm devices are easily accessible to general staff with findings submitted to QAPI for review and recommendations. 5. Maintenance Director is responsible for maintaining compliance.