Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0222
E

Missing Delayed Egress Signage on Exit Doors

Muskegon, Michigan Survey Completed on 04-29-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

A deficiency was identified when surveyors observed that the delayed egress double doors located at the south end of the facility did not have the required 15-second delayed egress sign. This observation was made during a walkthrough and was confirmed through an interview with the facility Maintenance Director at the time of the observation. The lack of proper signage on the delayed egress doors means that the doors were not in compliance with the requirements for special locking arrangements as outlined in the applicable codes. The report specifically notes that the door was not identified as a delayed egress door, which is necessary for proper emergency exiting procedures. The deficiency could potentially affect 35 occupants in the area if emergency exiting is required.

Plan Of Correction

Element #1 Signage was added to the emergency egress door that indicates 15 second egress. Element #2 Signage was added to the emergency egress door that indicates 15 second egress. A facility-wide audit was conducted to validate all egress doors have appropriate signage. Element #3 The EVS facility manager will monitor egress doors twice weekly to assure signage remains. The EVS Manager will report findings of missing signage immediately to the Administrator. And will report recommendations and audit findings to the Quality Assurance Performance Improvement Committee monthly, and periodically thereafter. The Administrator will assume responsibility for attained compliance.