Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Failure to Maintain and Inspect Emergency Generator

Bryn Mawr, Pennsylvania Survey Completed on 04-15-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain and inspect the emergency generator, which affected the entire facility. During a document review, it was found that the facility could not provide documentation for several critical tests and inspections. These included the monthly testing of battery electrolyte specific gravity or conductance testing, an annual 90-minute load bank test or a report indicating the unit meets 30% of the nameplate, and an annual fuel sample report. This lack of documentation was confirmed during an exit interview with the Administrator, Maintenance Director, and Regional VP of Operations. Additionally, an observation revealed that the emergency generator set location in the basement, specifically the transformer room, lacked battery back-up emergency lighting. This deficiency was also confirmed during the exit interview with the facility's leadership team. The absence of these critical components and documentation indicates a failure to comply with the necessary maintenance and testing requirements for the emergency power systems as outlined by NFPA standards.

Plan Of Correction

1.) A. Upon observation on April 15, 2025, the Maintenance Director and/or Designee performed the monthly testing of battery electrolyte specific or conductance testing. B. Annual 90-minute load bank or report indicating unit meets 30% of name plate - was not due for annual testing; however, it was completed. C. Annual fuel sample report although not due was completed. D. In the basement, the emergency generator set location (transformer room) a battery back-up emergency light was installed. 2.) The Maintenance Director and/or designee although not due had the Annual 90-minute load bank and Annual fuel sample reports completed. 3.) To prevent the potential for reoccurrence the Administrator and/or designee educated the Maintenance Director and/or designee on the importance of ensuring all reports are completed timely and available for review. 4.) To monitor and maintain ongoing compliance the Administrator and/or designee audit both the monthly and annual testing reports and ensure the back-up battery operated emergency lighting is in place and operable monthly for 3 months. Findings will be reported to facility QAPI for continued review and recommendations.