Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
F

Sprinkler System Maintenance Deficiencies

Bryn Mawr, Pennsylvania Survey Completed on 04-15-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its automatic sprinkler system components, impacting the entire facility. During a document review on April 15, 2025, it was found that the sprinkler inspection report from April 2, 2025, identified several deficiencies. The wet system's tamper in the pit did not report to the panel during the inspection, and it was noted that the pit consistently fills with water, requiring the facility to monitor and pump out the water for proper inspection and maintenance. Additionally, the dry system's last Fire Department Connection (FDC) hydrotest date was unknown, necessitating an immediate test. These deficiencies were confirmed during an exit interview with the Administrator, Maintenance Director, and Regional VP of Operations.

Plan Of Correction

1) A. Wet System - The tampers in the report to the alarm panel. B. Dry System - The Maintenance Director or Designee will ensure to FDC hydrotest date is confirmed and completed. 2) The Maintenance Director and/or designee inspected the tampers, confirmed reporting to the alarm system, and the pit does not have accumulating water. 3) To prevent the potential for reoccurrence, the Administrator educated the Maintenance Director and/or designee on the importance of ensuring the tampers report to the alarm system and the pit does not have accumulating water. 4) To monitor and maintain ongoing compliance, the Maintenance Director and/or designee will inspect the pit weekly for one month, and monthly for the next two months. If an issue is identified, the vendor will be contacted to restore the tamper connection to the alarm and assure there is no accumulation of water in the pit. Findings will be reported to facility QAPI for continued review and recommendations.

An unhandled error has occurred. Reload 🗙