Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
E

Sprinkler System Maintenance Deficiency

Cohoes, New York Survey Completed on 04-01-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The automatic sprinkler system in Building #31 (House #1) was not maintained according to the National Fire Protection Association (NFPA) 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems 2011 Edition. Specifically, the top of storage was found to be less than 18 inches from the sprinkler deflectors, which is a violation of sections 4.1.6.1 and 5.3.1.1.1.6 of the NFPA 25 standard. This deficiency was observed during a recertification survey on March 28, 2025, at 2:24 PM, in both the storeroom and walk-in freezer. During an interview conducted shortly after the observation, the Facilities Manager acknowledged the issue and indicated plans to address the storage placement and communicate with the dietary department regarding the storage requirements.

Plan Of Correction

Plan of Correction: Approved May 5, 2025 Element 1: Storeroom and walk-in freezer was moved to ensure storage is not within 18 inches of the sprinkler. Element 2: All kitchen storage areas will be checked to ensure storage meets requirements with sprinkler clearance. Any inconsistency in storage will be corrected at time of identification and education provided. Element 3: The nurse educator or designee will provide education to food service staff regarding storage clearance requirements. This education will be part of onboarding of new staff and annual education. Element 4: Weekly audits of the storage room and walk-in freezer will be completed to ensure that storage is not within 18 inches of sprinkler. Audits will continue for 3 months. Results of audits will be reviewed at the monthly Quality Assurance Committee meeting. Audits will continue for 3 months; at that time, the Quality Assurance Committee will make recommendations regarding ongoing audits, frequency, or change in plan. Facility manager responsible for ongoing compliance.

An unhandled error has occurred. Reload 🗙