Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
F

Deficiency in Emergency Generator Testing Records

Cohoes, New York Survey Completed on 04-01-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain emergency generator testing records in compliance with the National Fire Protection Association (NFPA) standards and federal regulations. Specifically, the emergency generator monthly test records did not document the load percentage of the nameplate under which the tests were conducted, nor did they record the generator transfer times. Additionally, the 4-hour load test records lacked documentation of engine performance during each hour of the test, including transfer time, percent of load, amperage, oil pressure, and water pressure. This deficiency was identified across multiple buildings within the facility, including Buildings #2, #3, #4, #5, #6, #7, #8, #10, #12, #14, #16, #19, #21, #22, #24, and #31 (House #1). The lack of proper documentation was consistent throughout these buildings, indicating a systemic issue in maintaining accurate and complete records for emergency generator testing. The absence of detailed records as required by NFPA 99 and NFPA 110 standards suggests a failure in the facility's processes for ensuring compliance with life safety code requirements. During the survey, the Facilities Manager acknowledged the deficiencies in the generator testing records and indicated plans to update the records to include the necessary information. However, the report focuses on the existing deficiencies and the lack of compliance with the required standards, without detailing any corrective actions or plans for future compliance.

Plan Of Correction

Plan of Correction: Approved April 25, 2025 Element 1: Generator vendor was contacted to complete the 4-hour load test by (MONTH) 13, 2025, including engine performance during each hour of the test, including transfer time, percent of load, amperage, oil pressure, and water pressure. Generator testing records were amended to the load and generator testing times. Element 2: All residents have potential to be impacted. Element 3: Maintenance staff will be educated by facilities manager on the updated generator test log to ensure staff are aware of the required elements of generator testing. Education will be completed by (MONTH) 13, 2025. Element 4: Generator Test logs will be reviewed by facility manager or designee after all any generator testing to ensure all required elements were documented. Completed log will be brought to the monthly Quality Assurance committee to ensure compliance. Audits will be an ongoing part of the monthly Quality Assurance Committee. Committee will make recommendations for changes in plan as appropriate based on audit results. Facility Manager responsible for ongoing compliance.