Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
D

Improper Labeling of Exit Signs

Ithaca, New York Survey Completed on 01-24-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure proper labeling of exit signs in accordance with the National Fire Protection Association (NFPA) 101 standards. During the Life Safety Code recertification survey, it was observed that the double doors to the upper courtyard and the single door from the second-floor lounge area to the upper courtyard were not labeled as either an exit or a non-exit. This lack of labeling could lead to confusion, as these doors might be mistaken for exits. The Director of Facility Services acknowledged during an interview that the doors should have been labeled 'No Exit' to ensure the safe egress of residents and staff.

Plan Of Correction

Plan of Correction: Approved March 7, 2025 (Exit Signage) The Facility Services Director has installed the proper signage to read (No Exit) on the following doors: The double doors to the upper courtyard, second-floor lounge, and 3 east middle hall door to the roof. The Facility Services Director or designee will conduct a Facility wide audit of all (No Exit) doors throughout the facility to ensure that there are no other non-exit doors that are out of compliance and if there are any other doors found to be deficient they will be corrected in a timely manner. The Facility Services Director or designee will conduct a Facility wide audit of all Non Exit doors throughout the facility on a quarterly basis to ensure that signage remains on the doors. The audits will be monitored and reported to the QAPI committee on a quarterly basis. The deficiency will be corrected no later than 3/25/25. The Facility Services will be responsible for this plan of correction.

An unhandled error has occurred. Reload 🗙