Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
D

Deficiency in Egress Lighting Maintenance

Brooklyn, New York Survey Completed on 03-19-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that lighting in all means of egress was continuously maintained, as required by safety regulations. During a life safety survey conducted over two days, it was observed that a manual switch on the wall in the basement storage room (B23) could disable all lights, leaving the area in total darkness. Additionally, a ramp area leading to the public way on the exterior of the facility, measuring approximately 20-30 feet, was found to lack egress lighting. These deficiencies were confirmed during an interview with the Maintenance Director, who acknowledged the issue.

Plan Of Correction

Plan of Correction: Approved April 4, 2025 I. Immediate Corrective Action Maintenance removed the light switch and replaced it with a metal plate for the basement in order to prevent the light from being turned off. Lights were added to the ramp area to ensure continuous illumination. II. Identification of Other Residents The facility respectfully states that residents could potentially be affected by this deficient practice. An audit of facility lighting in all means of egress was conducted. No outstanding issues were found. III. Systemic Changes The Maintenance department was in-serviced and educated about Illumination of Means of Egress. Continuous illumination was added to the monthly environmental rounds. IV. QA Monitoring The facility will conduct a review of all lighting by means of egress on a quarterly basis. This report will be done by the Director of Maintenance or his designee and submitted to the QA committee for review. On a quarterly basis, the Director of Maintenance or designee will report findings to the QAPI Committee to determine if further action is required. Responsible Party: Director of Maintenance