Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
E

Patio Gate Obstruction Due to Unavailable Key

Brooklyn, New York Survey Completed on 03-19-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that the patio gate leading to the public way was unobstructed, as required by safety regulations. During a life safety survey conducted over two days, it was observed that the patio on the main floor was secured with a padlock. When surveyors requested the gate to be opened, the key was not immediately available, necessitating staff to re-enter the building to retrieve it. This delay in accessing the key indicates a deficiency in maintaining an unobstructed and accessible exit path, as required by safety standards.

Plan Of Correction

Plan of Correction: Approved April 4, 2025 I. Immediate Corrective Action A break box with the key to the gate was installed on 4/4/25 near the emergency exit for easy access in case of an emergency. II. Identification of Other Residents The facility respectfully states that residents could potentially be affected by this deficient practice. An audit of all exit areas leading to the street was conducted. No other outstanding issues were found. III. Systemic Changes Maintenance was in-serviced regarding the need for easy access to exit the building and property in an event of an emergency. A comprehensive review of all exits was done, no other issues were noted. IV. Monitoring On a monthly basis for one quarter, Director of Maintenance or designee, will check the facility exits to the public way for potential obstruction. Any outstanding issues will be reported to the Administrator and corrected immediately. On a quarterly basis, Director of Maintenance or designee, will report findings to QAPI Committee to determine if further action is required. Responsible Party: Director of Maintenance

An unhandled error has occurred. Reload 🗙