Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Missing Generator Fuel Quality Test Documentation

Rhinebeck, New York Survey Completed on 02-27-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that the required generator tests were performed in accordance with NFPA 101 and NFPA 110 standards. During a Life Safety recertification survey, it was observed that the documentation for the current fuel quality test of the facility's generator was missing and not provided at the time of the survey. The last recorded fuel quality test was conducted in 2023, indicating a lapse in compliance with the testing schedule. This deficiency was confirmed during an interview with the Corporate Regional, who acknowledged the oversight and mentioned that the vendor would be contacted to address the issue.

Plan Of Correction

Plan of Correction: Approved March 14, 2025 K918 – Essential Electrical Testing and Maintenance I. Immediate Corrections The facility engaged the Emergency Generator service provider to perform fuel quality testing. Testing completed (MONTH) 7, 2025. II. Plan of Correction to Identify Other Areas Potentially Affected It was determined that all residents have the potential to be affected by the facility not ensuring that the required emergency generator fuel quality test is completed. The Director of Plant Operations will review all record and log reports to ensure required systems testing and inspection are completed as per the required code and regulations. Work completed: (MONTH) 12, 2025 III. Systemic Changes The facility maintenance record and log policy were reviewed; it was determined that no changes were needed to the policy. The Director of Plant Operations will review all required records and logs to ensure periodic testing, inspections, and services are completed as per schedule. All maintenance staff will receive in-service education, and all participants will understand the life safety issues identified, with a focus on the annual fuel testing requirements for the Emergency Generators. The Director of Plant Operations has been assigned responsibility for the education of staff. Work completed: (MONTH) 13, 2025 IV. QA Monitoring The Director of Plant Operations or Designee will develop an audit tool to verify that required generator annual fuel tests are completed in accordance with NFPA 101 and NFPA 110. 1. Audits will be completed by the Director of Plant Operations quarterly x 2 quarters, then complete annually thereafter. 2. Any discrepancies noted will be addressed immediately, reported to the Administrator, and to the QA Committee for tracking and trending. 3. Audit of findings will be presented to the QA Committee Quarterly x 2 Quarters then annually thereafter for evaluation and follow-up as indicated. Responsibility: Director of Plant Operations/Designee