Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0351
D

Deficiency in Sprinkler System Coverage

Far Rockaway, New York Survey Completed on 03-07-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that all areas of the building were protected by an automatic sprinkler system, as required by the 2012 NFPA 101 and 2010 NFPA 13 standards. During a life safety survey, a storage structure attached to the back of the building was observed to be constructed with combustible materials, including wooden roof supports. This structure, measuring approximately 20 feet by 8 feet, was located within 10 feet of an egress door at the rear of the building and contained a large amount of cardboard boxes, which are considered combustible materials. The deficiency was identified during an observation at approximately 10:30 am on March 6, 2025. The lack of sprinkler protection in this area was confirmed through staff interviews, indicating a failure to comply with the required fire safety standards. The presence of combustible materials in a structure without adequate sprinkler coverage poses a potential fire hazard, which was not directly addressed in the report. The facility's administrator acknowledged the issue during the exit conference on the same day.

Plan Of Correction

Plan of Correction: Approved March 19, 2025 I. Immediate Corrective Actions 1. The facility maintenance department made a plan to demolish the storage shed near the egress. 2. The storage identified without a sprinkler will be completely removed. II. Identification of Other Residents 1. All residents have the potential to be affected by the deficient practice. 2. The maintenance department reviewed sprinkler coverage throughout the Facility and no additional areas were identified. III. Systemic Changes: 1. All Maintenance staff were informed and educated on (MONTH) 18th regarding sprinkler heads and their locations, as well as overview of requirements for sprinkler coverage as per K351. 2. The education concentrated on the requirements to maintain sprinklers in all needed areas as well as ensure sprinkler heads are installed as required. IV. QA Monitoring 1. The Maintenance staff has developed an audit tool to validate preventive maintenance and track compliance with all the sprinkler heads/locations. 2. Audits will be done weekly x4 initially by Maintenance/designee to inspect the sprinkler heads/locations, then monthly thereafter for compliance with our preventive maintenance plan. 3. Any sprinkler heads/locations identified with quality issues by these audits will be corrected by the Maintenance staff or Fire Safety Company staff as needed. 4. Audit findings will be presented to the QA Committee quarterly for evaluation and follow up as indicated. II. Responsible person: Director of Environmental Services Date of completion: 5/1/25