Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Emergency Generator Maintenance Deficiency

Edison, New Jersey Survey Completed on 12-20-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its emergency generators in accordance with NFPA 99:2012 Edition, as evidenced by a documentation review conducted on December 19, 2024. The review revealed that the generator was not tested at least once every 36 months under load for a minimum of four continuous hours. Additionally, a routine maintenance report from August 6, 2024, indicated potential issues with the fuel system, suggesting that the injection pump and injectors might need rebuilding. A subsequent report on August 7, 2024, highlighted that the generator had over 1000 hours of operation and a history of failures, including an inability to carry load and erratic engine speed, compounded by water in the fuel system. During an interview, the facility representative confirmed the findings and acknowledged that repairs had not yet been made. Furthermore, the representative admitted that there was no current Memorandum Of Understanding (MOU) for a portable rental generator, although efforts were underway to secure one to facilitate repairs to the onsite generator. This deficiency had the potential to affect all residents, as it compromised the reliability of the emergency power source.

Plan Of Correction

1. All residents have the potential to be affected by this deficient Life Safety Code. A qualified contractor, [R] was contacted and came to assess the generator on 1/6/2025 and performed a four-hour generator load test on 2/11/2025. 2. The Maintenance Director added the required 4-hour load test every 36 months to the facility maintenance schedule. 3. The Maintenance Director will review the generator maintenance and inspection reports monthly to ensure that the required testing and maintenance was completed timely. The results of this review will be submitted to the administrator and to the QAPI committee monthly and to the QA committee quarterly ongoing.