Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0916
F

Emergency Generator Annunciator Panel Deficiency

Edison, New Jersey Survey Completed on 12-20-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure compliance with NFPA 99 standards regarding the emergency generator's remote annunciator. During an observation, it was noted that the remote annunciator panel for the emergency generator was not functioning properly at the nurse's station on the second floor. Specifically, the panel lacked a means to indicate it was receiving power and did not have a lamp test switch to verify the operation of all alarm lamps. This deficiency was confirmed through an interview with the U.S. FOIA representative present during the survey. The issue was communicated to the facility's representative during the Life Safety Code exit conference.

Plan Of Correction

1. All residents have the potential to be affected by this deficient Life Safety Code. A qualified contractor, NJ Ex Order 26.4(b)(1), was contacted and came to assess the generator on 1/6/25 and will repair/replace the remote annunciator panel to include a means to show that it is receiving power and a lamp test switch(es) to test the operation of all alarm lamps. This work was completed by NJ Ex Order 26.4(b)(1) on 2/11/2025. 2. The Maintenance Director added a monthly annunciator panel test to the generator maintenance schedule. 3. The Maintenance Director will review the generator maintenance and inspection reports monthly to ensure that the required testing was completed timely. The results of this review will be submitted to the administrator and to the QAPI committee monthly and to the QA committee quarterly ongoing.

An unhandled error has occurred. Reload 🗙