Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0111
F

Facility Non-Compliance with Building Rehabilitation Standards

Sharon, Pennsylvania Survey Completed on 04-08-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to comply with building rehabilitation requirements as evidenced by several projects completed without submitting plans to the State Plan Review or obtaining a granted occupancy from the Division of Safety Inspection. On April 8, 2025, during an observation between 8:45 a.m. and 11:00 a.m., it was noted that an outside generator was installed in November 2023 without the necessary plans or an H number. Additionally, the fire alarm panel was replaced, and the automatic fire detection system and sprinkler head were removed from the elevator pit. An interview with the maintenance director on the same day confirmed that the facility was unable to provide the required plans documentation at the time of the survey. These actions indicate a failure to adhere to the NFPA 101 Building Rehabilitation standards, specifically regarding repair, renovation, modification, or reconstruction requirements, as well as the necessary compliance for changes in use or occupancy and additions.

Plan Of Correction

Maintenance director and administrator will obtain the appropriate plans and H number for the outside generator installation from the contractor and submit to the state by 5/13/2025. Maintenance director and administrator will obtain plans for the fire alarm panel that was replaced from the contractor and submit to the state by 5/13/2025. Maintenance director and administrator will obtain the appropriate plans and H number for the outside generator installation from the contractor and submit to the state by 5/13/2025. Maintenance director and administrator will obtain plans for the fire alarm panel that was replaced from the contractor and submit to the state by 5/13/2025.