Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
F

Sprinkler System Maintenance Deficiencies

Newtown Square, Pennsylvania Survey Completed on 04-17-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain and inspect its sprinkler system in accordance with NFPA 25 standards, affecting the entire facility. During a document review on April 17, 2025, it was found that the facility could not provide documentation of an annual exercise of control valves through their complete range of motion. Additionally, observations revealed physical deficiencies, including two missing sprinkler escutcheons in the oxygen room Dundale and a suspended ceiling wire improperly anchored to a sprinkler branch line in the smoke separation vestibule on the first floor, creating an external load on the sprinklers. Further observations on the same day identified another deficiency affecting one of the three levels of the facility. A missing sprinkler escutcheon was noted outside the security office and the mechanical room on the first floor. These deficiencies were confirmed during an exit interview with the Administrator and the Director of Maintenance, highlighting the facility's failure to maintain and inspect the sprinkler system adequately.

Plan Of Correction

Dunwoody will have their sprinkler vendor inspect the sprinkler control valves and will document confirmation that they exercised their complete range of motion by 5/30/2025. This will be completed and documented as part of their annual inspection going forward. Missing escutcheons will be installed by 5/30/2025 by Dunwoody Maintenance staff and checked quarterly as part of our quarterly safety inspections by the Maintenance Manager or designee. The ceiling grid wire will be removed from the sprinkler pipe by 5/30/2025 by Dunwoody's Maintenance staff. All maintenance mechanics will be inserviced on this by 5/30/2025. Missing escutcheons will be installed by 5/30/2025 by Dunwoody Maintenance staff and checked quarterly as part of our quarterly safety inspections by the Maintenance Manager or designee. All maintenance mechanics will be inserviced on this by 5/30/2025.