Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0131
E

Failure to Maintain Building Separation

Newtown Square, Pennsylvania Survey Completed on 04-17-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain proper building separation in sections classified as other occupancies. During an observation on April 17, 2025, at 9:50 a.m., it was noted that the doorway to Country House, which is situated between the skilled nursing and assisted living areas, did not have a 1 1/2 hour fire-resistant door. This deficiency was confirmed during an exit interview with the Administrator and the Director of Maintenance on the same day at 11:15 a.m., where it was acknowledged that there was a lack of complete two-hour fire-resistant separation as required by the regulations.

Plan Of Correction

2-hour fire resistant doors will be purchased and installed by 7/11/2025 by Dunwoody's General Contractor. The Maintenance Manager or designee will inspect these doors weekly for the initial two months and then annually as part of our Annual Fire Door Inspection. All maintenance mechanics will be inserviced on this by 7/11/2025. Dunwoody will ask for a TLW as July 11 is close to the 90th day and if there is any type of delay by contractor or delivery or production of door it may be necessary to have the TLW.

An unhandled error has occurred. Reload 🗙