Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0352
F

Failure to Maintain Automatic Sprinkler System

Wilkes Barre, Pennsylvania Survey Completed on 04-08-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the automatic sprinkler system as required, which was evidenced by a supervisory signal indicating a fire pump loss of power on the fire alarm panel. This issue was observed during an inspection on April 8, 2025, affecting all three floors of the facility. Although the facility had a new fire pump on site, it had not yet been installed. Previous fire alarm testing conducted on April 1, 2025, did not reveal any deficiencies. The deficiency was confirmed during an exit interview with the Facility Administrator and Facilities Manager.

Plan Of Correction

1. The facility has contracted with Beach Lake Sprinkler to replace the fire pump panel on the week of May 5, 2025. 2. The facility fire pump controller will be reviewed and updated as needed. 3. NHA will educate the Maintenance Director, to assure the fire pump is updated as needed. 4. Fire pump will be audited weekly x4 then monthly x3 by Maintenance Director/Designee to ensure fire alarm pump is up to date. Audits will be reviewed at QAPI for further recommendations.